BHP Tug Harbour - Australia
Port Headland, Australia

1.png

ESC Scope of Supply​

​

ESC was awarded the job to supply 2,242MT of painted SSAW pipe with clutches.

​

Corrosion Protection System

​

  • Interzone 954 (Total DFT: 500µm), Surface cleanliness: Sa2.5

  • MDPE Coating

2.jpg

Product & process audit. Representative Auditor from Edgen Murray Pty Ltd. & Lend Lease Engineering Pty. Ltd.​

Project Photos

Project Photos

BLASTING & PAINTING

MDPE COATING

HEAT SHRINK SLEEVE INSTALLATION & INSPECTION

PACKING, STACKING & SHIPPING